Whether you’re moving across Ramsey or across the county, knowing what to expect makes everything easier. At New Jersey Moving & Storage, we follow a refined, professional timeline that keeps your move predictable from start to finish.
3 Days Before Move Day
- Confirm details. Double-check your move date, window, and address with dispatch.
- Reserve parking. If applicable, arrange temporary permits or loading dock access.
- Finish packing essentials. Leave out your “Open-First” box with chargers, medications, and basic supplies.
Morning of the Move
- 7:30 – 8:00 AM: Crew arrival and walkthrough. Your foreman will introduce the team and review the plan.
- 8:00 – 8:30 AM: Furniture protection — padded, wrapped, and secured before loading begins.
- 8:30 – 11:30 AM: Systematic loading by room and weight class. Larger items first, boxes second, delicate items last.
Midday
The truck is secured, inventory double-checked, and your crew leader confirms the destination address and route. Travel times vary, but we always estimate arrival before unloading begins.
“A professional move feels like choreography — everything happens in a deliberate order.”
Arrival at the New Home
- Floor protection first. Runners and pads keep everything clean.
- Furniture placed by room. Crew will ask where you want major items set before unwrapping.
- Boxes staged by label. “Kitchen – Priority” means it lands exactly there.
- Assembly. Beds, tables, and larger furniture pieces reassembled right away.
Late Afternoon: Finishing Touches
Once everything’s unloaded, we’ll complete a final inventory check and do a walk-through with you. Anything marked “fragile” is verified on delivery, and we handle the last small adjustments before leaving.
After the Crew Leaves
- Walk through each room for left-behind packing paper or tools.
- Unpack essentials first — kitchen, beds, and toiletries. The rest can wait.
- Tip your crew if they went above and beyond — it’s always appreciated but never expected.
- Leave a quick review if we earned it! Feedback keeps small local businesses strong.
Pro Tip: Move Like a Project Manager
Print or save your timeline and check off each phase. Moves with a clear timeline finish faster and reduce stress for everyone.
Sample Full-Day Schedule
Time | Phase |
---|---|
7:30 – 8:00 | Crew arrival, walkthrough, floor protection |
8:00 – 11:30 | Loading + furniture prep |
11:30 – 1:00 | Travel and lunch break |
1:00 – 4:00 | Unload, assemble furniture, stage boxes |
4:00 – 5:00 | Final walkthrough, signatures, payment |
Want a customized move-day timeline for your home? Request a free quote — our planners can map out exactly how long your specific move will take and what to prep ahead of time.